Sewerage & Water Board Information

Link to construction projects

Link to RoadWork

Storm drainage any pipes that are 36inches in diameter or larger are the responsibility of the Sewerage and Water Board while pipes that are smaller (including catch basins) are the responsibility  of the City’s Department of Public Works.

Report a Leak or Field Problem

Information on the “smart meters” that will be installed

Data and Statistics